1
ML's TZ. A little rough here and there but not bad.
Faded on this side.
|
2
|
3
Other side isn't as faded.
|
4
Playfield is pretty nice.
|
5
|
6
|
7
|
8
Boards are decent will need to be serviced though.
|
9
Head gutted.
|
10
Inside is average.Some corrosion is present on the metal.
|
11
|
12
Underside is fairly original and has the typical amount of dirt and dust.
|
13
Heavier corrosion is present on the resting brackets.
|
14
Underside teardown in process.
|
15
Wiring is removed.
|
16
|
17
Most of the underside parts are removed.
|
18
Topside teardown in process.
|
19
Playfield is out of the cabinet.Topside is stripped complete.
|
20
|
21
Underside stripped complete including the T nuts.
|
22
Cabinet teardown is next.
|
23
Cabinet gutted.
|
24
|
25
Head is emptied.
|
26
This is the worst spot.Should not be too tough.I have seen and done worse.
|
27
Lower is being stripped.
|
28
Stripped back to bare wood.
|
29
Starting o n the playfield.
|
30
Playfield is cleaned and the Mylar sections are removed.
|
31
Playfield cleaned up nicely so it will not need too much rework.
|
32
|
33
A little work will be needed at teh ball drop inlane.
|
34
The shooter has some type of issue that was masked at the factory.
|
35
This is a better shot.
|
36
I was able to sand that out for the most part to get down to a more natural layered look.
|
37
Another shot of the shooter lane.
|
38
Now I will drill for the third magnet install.
|
39
Hole is drilled.I will refinish it later in the process.
|
40
Playfield is sanded.
|