 Cabinet is just about ready.Standard legs holding it up while I rework a black set.
 
 

1
Cabinet is just about ready.Standard legs holding it up while I rework a black set.

2
 
 

2

3
 
 

3

4
Shaker motor installed.I tried to put it in a Williams typical location without fully covering or going through SR signature.
 
 

4
Shaker motor installed.I tried to put it in a Williams typical location without fully covering or going through SR signature.

5
 I anchored the shaker to the chock to avoind drilling and tee nuting the floor.There is a cover for each end of the weight a
 
 

5
I anchored the shaker to the chock to avoind drilling and tee nuting the floor.There is a cover for each end of the weight a

6
 Minor wear at the NZ but a solid/multiply repair has been made.Sometimes less wear is tougher to fix than more in terms of m
 
 

6
Minor wear at the NZ but a solid/multiply repair has been made.Sometimes less wear is tougher to fix than more in terms of m

7
 Final repaint.Really made an extra effort to match the real wood tone dead on and paint as little as possible.The targets wi
 
 

7
Final repaint.Really made an extra effort to match the real wood tone dead on and paint as little as possible.The targets wi

8
 Final clear applied.
 
 

8
Final clear applied.

9
Will need the typical light sand and buff but ready to go after a few days of cure time.The brutal NC summers make this a ver
 
 

9
Will need the typical light sand and buff but ready to go after a few days of cure time.The brutal NC summers make this a ver

10
 
 

10

11
 The legs have been prepped.I am going for a violet pearl based black with some blue and  straight metallic accents.The them
 
 

11
The legs have been prepped.I am going for a violet pearl based black with some blue and straight metallic accents.The them

12
 Legs are done and cleared with the same as the playfield.
 
 

12
Legs are done and cleared with the same as the playfield.

13
Blowing this pic up will help show the detail.The sun helps a bit too but it will be a little more subtle on the game becaus
 
 

13
Blowing this pic up will help show the detail.The sun helps a bit too but it will be a little more subtle on the game becaus

14
 
 

14

15
 The head brackets were done a similar way but just touch more to subtle side with a less glossy finish.The goal is o make t
 
 

15
The head brackets were done a similar way but just touch more to subtle side with a less glossy finish.The goal is o make t

16
The gun is being done next.It will not be identical to the legs or head brackets by design.The  thing is all these parts are
 
 

16
The gun is being done next.It will not be identical to the legs or head brackets by design.The thing is all these parts are

17
  I am going with natural/quasi chrome accents for the grip.This will pull the legs and rails together in a common theme.
 
 

17
I am going with natural/quasi chrome accents for the grip.This will pull the legs and rails together in a common theme.

18
 The gun has to be etched first because it is a high wear item.
 
 

18
The gun has to be etched first because it is a high wear item.

19 Color and cear applied.I cleared the entire part including the bare metal to help preserve it and create a barrier from  the
 
 

19 Color and cear applied.I cleared the entire part including the bare metal to help preserve it and create a barrier from the

20
 Even HUO games suffer from corrosion.They are still 15 years old and made of cheaper industrial metal.
 
 

20
Even HUO games suffer from corrosion.They are still 15 years old and made of cheaper industrial metal.

21
 
 

21

22
These brackets have been stripped down and sent to be plated in chrome with some other parts of the game.
 
 

22
These brackets have been stripped down and sent to be plated in chrome with some other parts of the game.

23
 Back from plating.
 
 

23
Back from plating.

24
 Legs and other painted parts installed.
 
 

24
Legs and other painted parts installed.

25
 
 

25

26
 
 

26

27
Ready to begin reassembly.d
 
 

27
Ready to begin reassembly.d

28
 All coil parts not plated were torn down and tumbled.
 
 

28
All coil parts not plated were torn down and tumbled.

29
Poppers reassembled.
 
 

29
Poppers reassembled.

30
Cannons reassembled.Laser mod is wired in.
 
 

30
Cannons reassembled.Laser mod is wired in.

31
Playfield has been polished and prepped for reassembly.
 
 

31
Playfield has been polished and prepped for reassembly.

32
 Reassembly of the playfield in process.Steve Ritchie signed the gamee on several locations including the underside of the p
 
 

32
Reassembly of the playfield in process.Steve Ritchie signed the gamee on several locations including the underside of the p

33
 Underside is almost complete and roughed in.STTNG is a tough one to neaten up until it is all together and working so that
 
 

33
Underside is almost complete and roughed in.STTNG is a tough one to neaten up until it is all together and working so that

34
Playfield is back in the game.
 
 

34
Playfield is back in the game.

35
Powered up for testing.
 
 

35
Powered up for testing.

36
The LED kits were installed.This is a little harder than I though just because of the time consuming task of locating each a
 
 

36
The LED kits were installed.This is a little harder than I though just because of the time consuming task of locating each a

37
 
 

37

38
 About one more day and we are all done.
 
 

38
About one more day and we are all done.

39
Purple post look great up top.
 
 

39
Purple post look great up top.

40
Went with the backboard decal instead of the lighted one.That one is just too dim and covered by the ship/ramps etc to be wo
 
 