1
Cabinet is just about ready.Standard legs holding it up while I rework a black set.
|
2
|
3
|
4
Shaker motor installed.I tried to put it in a Williams typical location without fully covering or going through SR signature.
|
5
I anchored the shaker to the chock to avoind drilling and tee nuting the floor.There is a cover for each end of the weight a
|
6
Minor wear at the NZ but a solid/multiply repair has been made.Sometimes less wear is tougher to fix than more in terms of m
|
7
Final repaint.Really made an extra effort to match the real wood tone dead on and paint as little as possible.The targets wi
|
8
Final clear applied.
|
9
Will need the typical light sand and buff but ready to go after a few days of cure time.The brutal NC summers make this a ver
|
10
|
11
The legs have been prepped.I am going for a violet pearl based black with some blue and straight metallic accents.The them
|
12
Legs are done and cleared with the same as the playfield.
|
13
Blowing this pic up will help show the detail.The sun helps a bit too but it will be a little more subtle on the game becaus
|
14
|
15
The head brackets were done a similar way but just touch more to subtle side with a less glossy finish.The goal is o make t
|
16
The gun is being done next.It will not be identical to the legs or head brackets by design.The thing is all these parts are
|
17
I am going with natural/quasi chrome accents for the grip.This will pull the legs and rails together in a common theme.
|
18
The gun has to be etched first because it is a high wear item.
|
19 Color and cear applied.I cleared the entire part including the bare metal to help preserve it and create a barrier from the
|
20
Even HUO games suffer from corrosion.They are still 15 years old and made of cheaper industrial metal.
|
21
|
22
These brackets have been stripped down and sent to be plated in chrome with some other parts of the game.
|
23
Back from plating.
|
24
Legs and other painted parts installed.
|
25
|
26
|
27
Ready to begin reassembly.d
|
28
All coil parts not plated were torn down and tumbled.
|
29
Poppers reassembled.
|
30
Cannons reassembled.Laser mod is wired in.
|
31
Playfield has been polished and prepped for reassembly.
|
32
Reassembly of the playfield in process.Steve Ritchie signed the gamee on several locations including the underside of the p
|
33
Underside is almost complete and roughed in.STTNG is a tough one to neaten up until it is all together and working so that
|
34
Playfield is back in the game.
|
35
Powered up for testing.
|
36
The LED kits were installed.This is a little harder than I though just because of the time consuming task of locating each a
|
37
|
38
About one more day and we are all done.
|
39
Purple post look great up top.
|
40
Went with the backboard decal instead of the lighted one.That one is just too dim and covered by the ship/ramps etc to be wo
|