81
Cabinet is ready for rebuild.
|
82
Plated playfield rails are in house.
|
83
Other plated parts for the cabinet and ramp are back from plating.
|
84
Head is rebuilt and back on the lower.
|
85
|
86
Chrome siderails were cut to fit and installed.SC uses a shorter rail so there is nothing off the shelf for it.
|
87
Receiver was chromed.
|
88
New T molding installed .Protective covering is sill on it at this point.
|
89
The wiring and cabinet internals will be next.
|
90
Playfield has been sanded and polished after curing.Rebuild in process.
|
91
Through parts installed.
|
92
Underside rebuild in process.
|
93
Switch harness roughed in place.
|
94
Lamp harness roughed in place most coill assemblies are installed.
|
95
Soleniod and opo harness are in place.The wiring is tightened up and the underside rebuild is almost complete.
|
96
|
97
|
98
|
99
|
100
|
101
|
102
|
103
|
104
Just one more ramp to go before the playfield is complete and ready to go bback in the cabinet as a full assembly.This is
|
105
Playfield is back in the cabinet.
|
106
|
107
|
108
The lamp panle will be rebuilt with a new rope light.
|
109
Most parts were cleaned and polished oters were plated.
|
110
Back box lamp panel is rebuilt.
|
111
Back in the game.
|
112
Powered up .
|
113
Game is basically complete.I have to get the new wings in order and a few other small things.
|
114
|
115
|
|