Login « Register « Sidebar
HEP Restoration Gallery » Playfield only restorations » Cactus Canyon playfield TP
 
Page: 1 2
 

Cactus Canyon playfield TP

76 items
1
 Playfied as it arrived.
 
 

1
Playfied as it arrived.

2
 Shooter lane is pretty rough.That seems to be normal on CC since it has such a short lane that goes right into a ramp.
 
 

2
Shooter lane is pretty rough.That seems to be normal on CC since it has such a short lane that goes right into a ramp.

3
 Chipping and splintering from the ball drops and wire guide removal.
 
 

3
Chipping and splintering from the ball drops and wire guide removal.

4
 Same issues to a smaller extent on the other side.
 
 

4
Same issues to a smaller extent on the other side.

5
 Chipping at the drop target holes.
 
 

5
Chipping at the drop target holes.

6
 Same thing other side.
 
 

6
Same thing other side.

7
 
 

7

8
 Mine hole wear.Ramp flap damage.
 
 

8
Mine hole wear.Ramp flap damage.

9
 Rounding of the edges in the Bart cut out.
 
 

9
Rounding of the edges in the Bart cut out.

10Divot and some wear at the popper exit into the jets.Most likely this area wil  splinter out when the Mylar is removed.
 
 

10Divot and some wear at the popper exit into the jets.Most likely this area wil splinter out when the Mylar is removed.

11
The wood in the red loop is very depressed and hammered.This may need to be trenched and filed.Refinishing will be needed at
 
 

11
The wood in the red loop is very depressed and hammered.This may need to be trenched and filed.Refinishing will be needed at

12
 T Nuts removed.
 
 

12
T Nuts removed.

13
 Ready to prep for the first clear.
 The condition of this playfield makes it best to clear it prior to doing any repaints
 
 

13
Ready to prep for the first clear.
The condition of this playfield makes it best to clear it prior to doing any repaints

14
 The shooter lane is likely to need o be repainted .I will shape it up first.
 
 

14
The shooter lane is likely to need o be repainted .I will shape it up first.

15
 This is as good as it gets without trenching it so at the least a light coat of wood tone will be needed.
 
 

15
This is as good as it gets without trenching it so at the least a light coat of wood tone will be needed.

16
 Playfield is cleaned and sanded.
 
 

16
Playfield is cleaned and sanded.

17
 The chips and splintered wood must be sealed and smooth prior to refinishing with any color.
 
 

17
The chips and splintered wood must be sealed and smooth prior to refinishing with any color.

18
 
 

18

19
 
 

19

20
 The mine hole is rough and the large divot from the  kickout into the jet bumpers will need to be filled.
 
 

20
The mine hole is rough and the large divot from the kickout into the jet bumpers will need to be filled.

21
 Initial clear is applied.
 
 

21
Initial clear is applied.

22
 Not much to look a yet but this is just a coat to seal it up.
 
 

22
Not much to look a yet but this is just a coat to seal it up.

23
 
 

23

24
 Okay the clear has sat a good while and that allows it to really shrink in.
 
 

24
Okay the clear has sat a good while and that allows it to really shrink in.

25
 A good example of the shrinkage is the shooter lane.Further along in the process that will be refinished but for now it sti
 
 

25
A good example of the shrinkage is the shooter lane.Further along in the process that will be refinished but for now it sti

26
 Playfield is sanded and being prepped for the structural repairs.
 
 

26
Playfield is sanded and being prepped for the structural repairs.

27
 
 

27

28
 Carbon fiber filler is used on all the chips and wear spot.
 This is the right inlane area filled.
 
 

28
Carbon fiber filler is used on all the chips and wear spot.
This is the right inlane area filled.

29
 This is the previous area final repair.
 
 

29
This is the previous area final repair.

30
 Left inlane filled.
 
 

30
Left inlane filled.

31
 Repair complete at the left inlane.
 
 

31
Repair complete at the left inlane.

32
 There are a lot of areas up top to address.They are all filled with the highlights being the mine hole,jet bumper kickout,b
 
 

32
There are a lot of areas up top to address.They are all filled with the highlights being the mine hole,jet bumper kickout,b

33
 Upper repairs complete.
 
 

33
Upper repairs complete.

34
 Ready to begin repaints.
 
 

34
Ready to begin repaints.

35
 The first areas to address are basically all the bare wood.Hard to tell in the picture but the entire area has been masked
 
 

35
The first areas to address are basically all the bare wood.Hard to tell in the picture but the entire area has been masked

36
 A very light over thinned wood tone is sprayed over the entire playfield.
 
 

36
A very light over thinned wood tone is sprayed over the entire playfield.

37
 Wood tone unmasked.
 
 

37
Wood tone unmasked.

38
 Hard to see in pictures but aside from the filled areas the natural grain still comes through(more faint now though)the spr
 
 

38
Hard to see in pictures but aside from the filled areas the natural grain still comes through(more faint now though)the spr

39
 The switch cut outs and damaged guide holes are roughed in.The will be finished out laer with  new borders as needed.Right
 
 

39
The switch cut outs and damaged guide holes are roughed in.The will be finished out laer with new borders as needed.Right

40
 
 

40

 
Page: 1 2
 
Advanced Search
Powered by Gallery v2.3