Login « Register « Sidebar
HEP Restoration Gallery » Playfield only restorations » Addams Family Gold playfield TP
 
Page: 1 2
 

Addams Family Gold playfield TP

52 items
1
 Playfield as it arrived.
 
 

1
Playfield as it arrived.

2
 Lower.
 
 

2
Lower.

3
Center.
 
 

3
Center.

4
Upper.
 
 

4
Upper.

5
 Rub through from apron.Inlanes gray has worn in dirt.That will hopefully sand out  without the need to repaint.
 
 

5
Rub through from apron.Inlanes gray has worn in dirt.That will hopefully sand out without the need to repaint.

6
 Sling Mylars.
 
 

6
Sling Mylars.

7
 Chair hole wear and Mylar section.
 
 

7
Chair hole wear and Mylar section.

8
 Trenched at the  upper ball drop.The gray in this area will need to be refinished.
 
 

8
Trenched at the upper ball drop.The gray in this area will need to be refinished.

9
 Some insert borderin up top.If I can get a good match I will refinish the purple and green to  eliminate it.Tough colors to
 
 

9
Some insert borderin up top.If I can get a good match I will refinish the purple and green to eliminate it.Tough colors to

10
 Swamp roll in has wear.The post hole in the med blue area is cracked and will likely not be solid enough to work over.
 
 

10
Swamp roll in has wear.The post hole in the med blue area is cracked and will likely not be solid enough to work over.

11
 As suspected the area is broke free.It mmay glue back on if not it will need to be repaired and refinished.Either will be f
 
 

11
As suspected the area is broke free.It mmay glue back on if not it will need to be repaired and refinished.Either will be f

12
 Shooter lane  will need work and there is an apron rub through on this side as well.
 
 

12
Shooter lane will need work and there is an apron rub through on this side as well.

13
 Mylar removed and the initial cleaning is done.
 
 

13
Mylar removed and the initial cleaning is done.

14
 Shooter lane sanded up very nicely.
 
 

14
Shooter lane sanded up very nicely.

15
 Playfield prepped for clear.
 
 

15
Playfield prepped for clear.

16
 I was able to  glue the  missing part back on in the  swamp area.
 
 

16
I was able to glue the missing part back on in the swamp area.

17
 Chair hole sanded up a bit  but it will need fill and paint.
 
 

17
Chair hole sanded up a bit but it will need fill and paint.

18
 Ground coat of clear applied.
 
 

18
Ground coat of clear applied.

19
 The  one vertical crack line and ground in drt have been eliminated.
 
 

19
The one vertical crack line and ground in drt have been eliminated.

20
 
 

20

21
 
 

21

22
 After a few days cure I will begin the  repair and repaint process.
 
 

22
After a few days cure I will begin the repair and repaint process.

23
Sanded and ready to  start the  repair and refinishing process.
 
 

23
Sanded and ready to start the repair and refinishing process.

24
 The  chair hole is not too bad but does need some fill in  work and refinishing.
 
 

24
The chair hole is not too bad but does need some fill in work and refinishing.

25
 Filler applied.
 
 

25
Filler applied.

26
  Structural repairs complete.
 
 

26
Structural repairs complete.

27
 Swamp  roll in needs some work.
 
 

27
Swamp roll in needs some work.

28
  Filler applied o swamp area.
 
 

28
Filler applied o swamp area.

29
 Structural reapirs to  swamp area  complete.
 
 

29
Structural reapirs to swamp area complete.

30
 The upper gray area has some minor wear and discoloration.
 
 

30
The upper gray area has some minor wear and discoloration.

31
 This is a divot  from the ball drop.
 
 

31
This is a divot from the ball drop.

32
 Upper loop  refinished.This will not be a  perfect match  but  it should blend in well and look great once installed.Gray s
 
 

32
Upper loop refinished.This will not be a perfect match but it should blend in well and look great once installed.Gray s

33
 The insert bordering in the violet will be refinished.The minor spot in the green will not because color match issues make
 
 

33
The insert bordering in the violet will be refinished.The minor spot in the green will not because color match issues make

34
 The red in the  lower portion is refinished in addition to the violet .The red area was previously roughed in  to hide the
 
 

34
The red in the lower portion is refinished in addition to the violet .The red area was previously roughed in to hide the

35
 Gray an masked.Not too bad a match.Once cleared I will have a better idea of if it is worth  trying to get any closer or no
 
 

35
Gray an masked.Not too bad a match.Once cleared I will have a better idea of if it is worth trying to get any closer or no

36
 Lower repairs unmasked.
Wood tones will be next.
 
 

36
Lower repairs unmasked.
Wood tones will be next.

37
 Wood tones refinished as needed.
 
 

37
Wood tones refinished as needed.

38
 Wood tones unmasked.
 
 

38
Wood tones unmasked.

39
 Chair hole refinished.The black border is just roughed in on this pass and will be  finished out on the  final repaints and
 
 

39
Chair hole refinished.The black border is just roughed in on this pass and will be finished out on the final repaints and

40
 Swamp area is  roughed in as well.
 
 

40
Swamp area is roughed in as well.

 
Page: 1 2
 
Advanced Search
Powered by Gallery v2.3