41
Now I will repair all the inserts.Every one will need the border painted.As can be seen when lit they are well worn.
|
42
Another example of the insert wear.
|
43
All inserts have been mask and painted..This is a VERY time consuming job as well.
|
44
Inserts are being untaped.
|
45
Overall things are looking much better.
|
46
Lower looks good.Not perfect because of the limitations I have in terms of the dithering but still a very convincing rep
|
47
|
48
Target bank is complete with border.
|
49
Ready to clear for the second time.
|
50
Second clear applied.
|
51
It is wet in these pictures so it will look a bit more over the top right now than it should or will once it dries.
|
52
|
53
I am very pleased with the fades knowing what it takes to pull it off on this level.
|
54
Inserts look great and most importantly will still look great when lit.
|
55
Target bank area,red sections and mode hole are in good shape now.
|
56
The wear and ball track as well as the cuts in the yellow are all gone now.
|
57
This is a shot of the playfield now that it has dried overnight.The gloss has died down.
|
58
Shooter lane was sanded and reworked as well as possible without an ugly repaint.
|
59
Switch cut outs and fades are settled in a little more.
|
60
This area shows the best transformation because it is the most obvious when playing and needed the most work.
I will l
|
61
Playfield is now sanded for the final clear.
|
62
|
63
Final clear applied.
|
64
Cured overnight.
|
65
|
66
|
67
After it sets a few days it will be ready to sand and polish.
|
69
Underside is sanded as clean as poissible without removing the customer markings.
|
70
Example of markings being preserved.
|
71
Inserts are dirty and will be cleaned.
|
72
Inserts cleaned.
|
73
All new t nuts are installed.
|
74
Playfield is sanded and ready to polish.
|
75
Playfield polished.New t nuts are installed on this side as well.
|
76
Close up of the repairs now that the job is finished.
|
77
Lower repairs as completed.
|
78
Shooter lane final.
|
79
Center.
|
80
|
81
Insert repairs as completed.
|