IJ playfield as it arrived.Looks decent overall.
|
2
Shooter lane is a bit rough .Not from wear but just from manufacturing.
|
3
A close up shows there is some deep pores and voids in the plys.I will try to work that out of there as well as possible o
|
4
Switch cut outs look pretty good.Once I really clean and prep it I will know if the ground in dirt is coming out or if it
|
5
|
6
Most of the inserts show wear at the borders.
|
7
I will need to refinish all the borders on this playfield.
|
8
Mode start hole and target bank cut out need some work but neither will require filler.
|
9
Single drop shows ground in dirt mostly.
|
10
Top lane looks okay.There is some dirt and tracking but it should clean and sand up without the need for repaint but I c
|
11
Underside will need to be stripped complete.T nuts removed etc.
|
12
T nuts and other hardware are removed.
|
13
Playfield is now in the paint shop.
|
14
Mylar is removed.
|
15
Shooter lane has two small cores that need to be dug out.This is done to make sure everything is solid prior to cleaing
|
16
These are the cores dug out.It is really just a cosmetic issue but I could not truly sand the lane up right without r
|
17
Repairs are being made just a little filler to make it solid.
|
18
Sanded lane.It will be lightly refinished in the damaged area.The wood tone used will be extremely transparent so the n
|
19
All the holes need to be cleaned and sanded out to eliminate the ground in dirt.
|
20
The switch cut outs and other through holes need the same.
|
21
|
22
Holes and cut outs are sanded clean.Takes quite a while to get each light hole,sling and switch cut out.
|
23
|
24
Target bank has it's initial rework done.It will likely need some light refinishing but that will be done after the first l
|
25
Mode hole area will also benefit from a little refinishing later.
|
26
Top lane and switches look to have sanded up well enough to avoid repaints.I will know for sure once cleared.
|
27
Shooter lane is being worked a bit.
|
28
Shooter lane unmasked and smoothed back in.
|
29
Repair looks great.Should look even better once cleared.It can also be tweaked at any point of the process if needed.
|
30
Ready for the first clear application.
|
31
First clear applied.
|
32
|
33
|
34
After it sets a few days I will sand it and begin doing the repaints.
|
35
Playfield is sanded once again.
|
36
Cleaned and prepped for repaints.
|
37
The swich cut outs will be refreshed because they have some ground in dirt at the drop area.All will need to be done in
|
38
The mode start and lock area will also need to be refreshed because of ground in dirt.
|
39
Woodtones refreshed/sprayed in the areas needed.It is a very light and transparent finish.
|
40
Next will be the very tedious task of masking and repainting all the insert borders.Most have chipping and wear.
|