Login « Register « Sidebar
HEP Restoration Gallery » Playfield only restorations » Cirqus Voltaire PF BK
 
Page: 1 2 3
 

Cirqus Voltaire PF BK

84 items
1
Playfield as it arrived.
 
 

1
Playfield as it arrived.

2
 
 

2

3
Shooter lane shows some  ground in dirt.
 
 

3
Shooter lane shows some ground in dirt.

4
Ghosting on several of the inserts.
 
 

4
Ghosting on several of the inserts.

5
Chip at the  boom  balloon and into the lettering.
also  wear at the Volt  roll over to the  wood.
 
 

5
Chip at the boom balloon and into the lettering.
also wear at the Volt roll over to the wood.

6
Ghosting of inserts and wear at the Ringmaster  cut out.
 
 

6
Ghosting of inserts and wear at the Ringmaster cut out.

7
Playfield is ready to  prep for the first clear.Hope to  eliminate most  of the ghosting and seal it at this point.
 
 

7
Playfield is ready to prep for the first clear.Hope to eliminate most of the ghosting and seal it at this point.

8
Chipping at the  trough entrance.
 
 

8
Chipping at the trough entrance.

9
Trough chipping  addressed.
 
 

9
Trough chipping addressed.

10
Shooter lane sanded as clean as possible.CV is tough with  such a short lane.
 
 

10
Shooter lane sanded as clean as possible.CV is tough with such a short lane.

11
Playfield is prepped and ready for an initial coat of clear.
 
 

11
Playfield is prepped and ready for an initial coat of clear.

12
 
 

12

13
First clear applied.
 
 

13
First clear applied.

14
Cleared up  as much of the /most of the  ghosting.
 
 

14
Cleared up as much of the /most of the ghosting.

15
 
 

15

16
 
 

16

16a
Playfield has cured for a couple weeks  now sanded and ready to start the repairs.
 
 

16a
Playfield has cured for a couple weeks now sanded and ready to start the repairs.

17
Cleaned and ready to start painting.
 
 

17
Cleaned and ready to start painting.

18
Shooter lane and lower wood tones need rework.
 
 

18
Shooter lane and lower wood tones need rework.

19
Inserts will need a little more  work as well.
 
 

19
Inserts will need a little more work as well.

20
Touch ups needed to fix the gouges here and there like this one near the polar  bear on the  left of the screen.
 
 

20
Touch ups needed to fix the gouges here and there like this one near the polar bear on the left of the screen.

21
Will start repairing the boom balloon area also.
 
 

21
Will start repairing the boom balloon area also.

22
Ringmaster cut out is  ready to fix as well.
 
 

22
Ringmaster cut out is ready to fix as well.

23
Wood tones are  sprayed.CV is very tough  because there is a lot of lettering in the lower area and that is surrounded by na
 
 

23
Wood tones are sprayed.CV is very tough because there is a lot of lettering in the lower area and that is surrounded by na

24
Wood tones unmasked.
 
 

24
Wood tones unmasked.

25
 
 

25

26
 
 

26

27
Will rework and lay the foundation for the boom balloon now.
 
 

27
Will rework and lay the foundation for the boom balloon now.

28
Yellow is  sprayed.
 
 

28
Yellow is sprayed.

29
Will add  the lettering now.
 
 

29
Will add the lettering now.

30
Lettering is added and  the outline of a border.That will need more  work later  but the  blueprint is there.
 
 

30
Lettering is added and the outline of a border.That will need more work later but the blueprint is there.

31
JTC insert  border  needs to be repainted.
 
 

31
JTC insert border needs to be repainted.

32
Border repainted.
 
 

32
Border repainted.

33
 
 

33

34
Fixing the  Volt roll over wear .
 
 

34
Fixing the Volt roll over wear .

35
Unmasked and ready t  clear again.
 
 

35
Unmasked and ready t clear again.

36
Second clear applied.
 
 

36
Second clear applied.

37
Lower areas are looking much  better.
 
 

37
Lower areas are looking much better.

38
 
 

38

39
 
 

39

 
Page: 1 2 3
 
Advanced Search
Powered by Gallery v2.3