1
Playfield as it arrived.
|
2
|
3
Shooter lane shows some ground in dirt.
|
4
Ghosting on several of the inserts.
|
5
Chip at the boom balloon and into the lettering.
also wear at the Volt roll over to the wood.
|
6
Ghosting of inserts and wear at the Ringmaster cut out.
|
7
Playfield is ready to prep for the first clear.Hope to eliminate most of the ghosting and seal it at this point.
|
8
Chipping at the trough entrance.
|
9
Trough chipping addressed.
|
10
Shooter lane sanded as clean as possible.CV is tough with such a short lane.
|
11
Playfield is prepped and ready for an initial coat of clear.
|
12
|
13
First clear applied.
|
14
Cleared up as much of the /most of the ghosting.
|
15
|
16
|
16a
Playfield has cured for a couple weeks now sanded and ready to start the repairs.
|
17
Cleaned and ready to start painting.
|
18
Shooter lane and lower wood tones need rework.
|
19
Inserts will need a little more work as well.
|
20
Touch ups needed to fix the gouges here and there like this one near the polar bear on the left of the screen.
|
21
Will start repairing the boom balloon area also.
|
22
Ringmaster cut out is ready to fix as well.
|
23
Wood tones are sprayed.CV is very tough because there is a lot of lettering in the lower area and that is surrounded by na
|
24
Wood tones unmasked.
|
25
|
26
|
27
Will rework and lay the foundation for the boom balloon now.
|
28
Yellow is sprayed.
|
29
Will add the lettering now.
|
30
Lettering is added and the outline of a border.That will need more work later but the blueprint is there.
|
31
JTC insert border needs to be repainted.
|
32
Border repainted.
|
33
|
34
Fixing the Volt roll over wear .
|
35
Unmasked and ready t clear again.
|
36
Second clear applied.
|
37
Lower areas are looking much better.
|
38
|
39
|