40
Playfield is sanded and treated with adhesion promoter.Now ready to begin repaints.
|
41
I will do the wood tones first.This will include the shooter lane ekect wear.
|
42
Cracking under the slings.
|
43
Cracking in the wood on the left side.
|
44
NZ hole.
|
45
Drop target area.
|
46
Wood tones masked and refinished.
|
47
The natural grain still comes through.
|
48
Wood tones unmasked.
|
49
Sling areas and switch cut outs done.
|
50
|
51
Cracks are going away.
|
52
NZ is taking shape.
|
53
I am ready to start working on the damaged insert.This is a 4 color repair.
|
54
Red is down first.
|
55
|
56
Just roughing some aspects in at first like the border to blueprint it.
|
57
Purple is done.
|
58
The insert repair is now roughed in.I will tighten it up on the last round sharpening the art etc but the general repair
|
59
NZ repaint is in process,This takes several different shades to try and help create the original screened look of the
|
60
|
61
NZ unmaksed.The border work will be done later.There is a risk of damaging what has been done trying to get the border do
|
62
Ready for the second clear application.
|
63
Second clear applied.
|
64
|
65
Natural wood areas look much cleaner now.
|
66
|
67
|
68
The inserts and cracks are leveling out.
|
69
|
70
|
71
NZ is coming along.
|
72
Repaired insert is very close to it's final form.
|
73
|
74
|
75
I will get back to it in a couple days.
|
76
Playfield is sanded again and ready to prep for what should be the final repaints and clear.
|
77
Playfield cleaned.
|
78
I will do the borders in the repaired areas on this pass.
|
79
I will perfect the insert repair.
|