1
Playfield as it arrived.
|
2
Small chip in a difficult spot.
|
3
Shooter lane has some rough routing which typically holds a lot of dirt in.
|
4
A little work will be needed at the target bank and mode hole area.
|
5
Being prepped for the first clear.
|
6
Shooter lane sanded as clean as possible.
|
7
Still has a little ground in dirt in the deeper grooves of the routing but probaby best left alone for now.
|
8
Slight ghost in the green insert should be able to get rid of that during the process.
|
9
First clear applied.
|
10
|
11
After a couple days I can sand it back down and do the repairs and repaints needed.
|
12
Mini cleared as well.
|
13
A little yellow work is done to help hide the small chip previously documented.
|
14
The mode start hole area gets a little wood tone work to eliminate the ground in dirt .
|
15
|
16
Ready for the next clear application.
|
17
|
18
|
19
|
20
|
21
Mini cleared again as well.
|
22
After a couple days cure I will determine if itis ready to sand and polish or sand and reclear.
|
23
Playfield is sanded and ready for final polish.
|
24
Playfield polished.
|
25
|
26
|
27
|
28
|
29
Mini is polished as well.
|
|
|
|