1
TOTAN playfield as it arrived.
|
2
|
3
Shooter lane will need a little work.The shorter lanes are a bit tougher to work with.
|
4
Vertical cracking,insert ghosting,raised inserts etc.
|
5
The larger blue insert will need to be reset.
|
6
A good amount of wear at the saucer hole.
|
7
The wear is more minor on this side.
|
8
Captive ball wear,ramp flap marks.
|
9
Bad wear at the vanishing magnet hole.
|
10
Lots of post damage and chipping in this area as well.
|
11
Tiger magnet wear.
|
12
|
13
Better shot of the insert raising.
|
14
Mylar sections removed the playfield is cleaned.
|
15
|
16
Shooter lane reworked a bit.
|
17
Ready to prep for the first clear.There is not much I can do with this playfield until I get the surface stabilized.It is to
|
18
|
19
Highlighting the cracking of the surface thoughout the playfield.Much of it in areas that will be hard if not impossible to
|
20
The repairs are made where possible.
|
21
First clear applied.
|
22
|
23
|
24
|
25
After this sets a few days will sand it and go from there.
|
26
Playfield is sanded and ready to continue repairs and repainting.
|
27
Will fill the ball drop damage on the right inlane.
|
28
Repair is made to inlane.
|
29
Will repair saucer hole.
|
30
|
31
|
32
|
33
All the post holes in this area are badly splintered and chipped.
|
34a
Repairs made to the post and wire guide holes.
|
34a
|
35
Same type of issues at the tiger magent hole area.
|
36
Repairs made .
|
37
Now ready to start working on the repaints.
|
38
all wood tones refinished including the GI bulb holes etc.Very time consuming but with all the cracking,repairs and discolor
|
39
Pale yellow is being done.
|