1
Playfield as it arrived.
|
2
Shooter lane needs work.
|
3
Bigger issue is the poorly installed mylar.This one was placed on the playfield then cut out.As a result there are many sc
|
4
|
5
Highlighting the mylar and cuts.Some spots are doubled Mylar.
|
6
Cuts can be seen along the edges.They are jagged.
|
7
|
8
|
9
|
10
Even before removing the mylar there are insert ghosting issues.Not uncommon for these playfields but it will only get
|
11
|
12
Sewer hole needs work.
|
13
after about 10 cans of freeze spray,lots of adhesive remover and several hours of pulling Mylar an inch or two at a tim
|
14
|
15
|
16
|
17
I can now start the reworking process.I have already done a little preliminary work to address the ghosted and peeling i
|
18
Sanded.
|
19
Cleaned as well as possible.
|
20
Shooter lane is imprioving a little but at some point it is going to need some wood tone work.
|
21
The damaged inserts are salvaged as well as you could hope for an d will at least provide something to work off of.
|
22
Sewer hole and the other one are being repaired.
|
23
|
24
The holes are taking shape.I will get some clear on there to bond them together better before I continue to rework them
|
25
Some hand work was done here and there just as a preliminary method to map things out prior to the first clear application
|
26
|
27
|
28
|
29
First clear applied.The first few pictures are taken when it is wet and freshly applied so it may look a little more hazy b
|
30
|
31
|
32
|
33
|
34
|
35
|
36
These are the pictures taken after and overnight cure.Nice and clear plus it will detail the surface conditions now that it
|
37
Shooter lane needs work but the clear is starting to seal the wood fibers that are splintered from wear.
|
38
|
39
The damaged inserts are shaping up.Getting them level and fixing the art is not problem at this point.The one issue that
|
40
|