1
Playfield as it arrived.
|
2
Shooter lane is decent should rework nicely.
|
3
Other lane is on par with the previous.
|
4
Will remove the wire guides.
|
5
|
6
|
7
Some damage in the center from the kickout.This will require a lot of repaint and won't be dithered since that was scre
|
8
There was a previous attempt at repairing the Axl hole.This will be corrected.
|
9
Some damage on the J insert surrounding art.
|
10
Some insert ghosting here and there.
|
11
Chipping at other various holes.
|
12
Mylar and guides removed.Ready to start reworking.
|
13
Shooter lane is reworked.Might require more as the process continues.
|
14
Starting to rework the axl hole.
|
15
Roughed in like the rest it will continue to be reworked throughout the process.
|
16
|
17
Going to rough in some of the art prior to the first clear application.These won't be close to the final versions but wil
|
18
|
19
|
20
Repairs are roughed in.
|
21
Ready for the first clear.
|
22
first clear applied.
|
23
|
24
The faint scratch in axls face is taken care of.
|
25
|
26
|
27
|
28
Just roughed in the center wear for now in order to make it cover better during the real repainting process that will ta
|
29
|
30
Axl hole and wear also roughed in.
|
31
After a few days cure I can get back to it.
|
32
Playfield is sanded and is being prepped for the most tedious portion of the repaints.
|
33
|
34
I will start with the worst area to rework the center.
|
35
Area is masked and repainted as well as possible.The main issue is that the gradients from screening can't be duplicated
|
36
This is the step down of the colors used.7 ranging from paler yellow to bright orange and most between.
|
37
Axl hole is further perfected.
|
38
Reworking the various worn wood at this point.
|
39
|
40
Wood tones are done as needed and/or in a way to make it fresh and uniform.
|