81 Castle lock hole rebuild and wood work..Loop looks good in addition to the previously damaged post hole locations below.
82 Ramp screw holes are repaired along with the flap damage.Repairing this area and above required a series of colors and tr
83
84
85
86 In a day or two I can sand it back down catch the final details and apply the final clear.
87 Playfield is sanded and being prepped for the final repaints and clear.
88 Final repaints are done.
89 Final clear applied.Wet in the following pictures.
90
91
92 After a few days cure it will be ready for final sanding and polishing.
93 Sanded and ready to polish.
94 Polished.
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112