1
Playfield as it arrived.Being prepped for the initial repairs and clear application.
|
2
Shooter lane is sanded as clean as possible.
|
3
There are some damaged inserts to repair.
|
4
|
5
|
6
First clear applied.
|
7
POA first clear.
|
8
Playfield is dry and ready to prep for the next repair and repaints.
|
9
I doubt I can do much more with this shooter lane with the exit wear and ugly transitions/knot so I will most likely need to
|
10
There are some scratches in the yellow and other spots here nad there.
|
11
The first clear should have sealed the damaged inserts and once sanded they should be level as well.
|
12
|
13
There is some ramp flap damage to repair in the ellow.
|
14
The center holes need repair and repaint.
|
15
Sanded and ready to start the next session.
|
16
|
17
Other wood areas need work because of ground in dirt or burn.
|
18
Repairs are made to the mode start hole.
|
19
Single drop needs wood tone work.
|
20
The orange orbits have minor chips and ground in dirt.
|
21
Repaints to the center holes.
|
22
Other wood tone repaints.
|
23
|
24
Shooter lane work continues.
|
25
A darker tone is candied in to hide the knots and ground in dirt.
|
26
A lighter color is misted to mask the darker tone it is not the final form it will be in but just a stepping stone
|
27
Inserts are ready to repaint where needed..
|
28
Inserts are repainted.There may be a slight difference in transparency where the repairs are done but two small spots
|
29
Will address the yellow and orange areas of concern now.
|
30
Loop,and other damaged areas repaired where needed.
|
31
Yellow work is done where needed.
|
32
Second clear applied.
|
33
|
34
Shooter lane is taking shape.This is never my preference but needed in some cases.
|
35
|
36
|
37
Insert repairs are looking great.Color match is very good for what is being asked of the process. I will need to tw
|
38
|
39
|
40
|