1 NOS Monster Bash playfield.
2 Has not been fully drilled nor dimpled which s normal for these.
3 Underside is carefully dimpled.Well predrilled really which is a much better process if you plan on actually using i
4
5
6 Underside is done.
7 Topside is done and it is now ready to prep and clear.
8 Sanded.
9 Cleaned.
10 Cleared.
11
12
13
14
15 After this sets a week or so it will be ready to sand and polish then pack and ship.
16 Sanded and ready to polish.
17 T nuts will be installed now.
18 T nuts installed.
19
20
21
22 Playfield is polished.
23
24
25
26
27
28 Ready to pack and ship.
29 Crated along with the NOS SS playfield.This crate will also be boxed.