Cactus Canyon playfield as it arrived less the Mylar sections I have already removed.
|
2
Shooter lane will need some work.Hope to keep it 100% natural but these short lane games tend to take a beating in this area
|
3
There is a lot of raised grain and puckering at screw holes on this playfield.Has likely been in a humid environment at some
|
4
Ball drops and switch cut outs will need a little work but I have seen much worse.
|
5
|
6
Some wear at the drop target holes.
|
7
|
8
Mine hole is a bit beat but what is most troubling with this playfield might be a bit harder to see in pictures.That problem
|
9
Better shot of the insert raised in this area.
|
10
More raised grain/the begining of delamination.
|
11
Typical divot in the jet bumper area yellow from the mine popper exit.
|
12
Other areas to be addressed will be the loop divots and transitions and a little work in the Bart cut out.
|
13
Ready to prep for the initial clear.
|
14
this insert will e relevled first.You can see how raised it is in this picture.
|
15
Insert is reset.
|
16
Bad guy insert reset as well.
|
17
Sanded.
|
18
Shooter lane will get some rough preliminary work.This one is tough because itis short and has a natural wood knot in it.Per
|
19
Hitting some natural wood spots.It is just to help eliminate some of the ground in dirt there.These will be done again as it
|
21
Cleaned and ready for the initial clear.
|
22
Initial clear applied.It is just something to work off of later.
|
23
|
24
|
25
Much closer level on thios insert now.
|
26
|
27
I will let this set a couple days then begin the actual repair and repainting process.
|
28
Ready to sand and begin repairs.
|
29
The clear has brawn in the areas of concern and will help highlight them.The insert in the green area is level and the crack
|
30
The divot will need to be filled.
|
31
The various cracks in the natural wood areas will be filled.
|
32
The bart cut out will need a little fill work as well.I try to keep that toa minimum on this particular section .
|
33
Playfield is sanded .
|
34
Shooter lane continues to be worked.
|
35
|
36
|
37
Structural repairs are made and the playfield is cleaned.
|
38
Shooter lane is smoothing up.It will need a bit more refinishing.
|
39
Repairs to the mine hole and drop target area.
|
40
Repairs are made in the natural wood areas fixing the cracks and minor splintering at the wire guides.
|
41
Divot is filled.
|