120
Warning text screened.
|
121
Cabinet is prepped and ready to decal.
|
122
Decals applied.They will be finished out next.
|
123
Cabinet edges are finished.Head back on lower and cabinet rebuild is nearly complete.
|
124
|
125
All boards were properly serviced.
|
126
Still have a couple of minor details left inside the cabinet like the sheet.
|
127
|
128
Through parts are installed on the playfield.
|
129
|
130
Playfield is read rebuild underside.
|
131
All targets and switches will be replaced including the roll overs though not pictured.
|
132
Switch harness rebuilt and in place.
|
133
This is the pile of trash taken out out of the switch harness.
|
134
All coils assemblies have been polished and rebuilt with new coils.Lamp harness and boards are in place.
|
135
|
136
Mine motor needs to be cleaned and rebuilt.
|
137
Parts are cleaned.
|
138
Reassembled and lightly lube to keep the noise down.
|
139
Bart head is pretty beat.
|
140
Torn down.The hat is trashed .
|
141
Parts are cleaned. New hat and head will be installed along with a new switch and sleeves.
|
142
Head will have the eyes drilled out and LEds will be installed.r
|
143
Head rebuilt ready to go back on the playfield.
|
144
Underside rebuild complete.
|
145
Brackets were plated.
|
146
Playfield back in the cabinet.
|
147
Powered up for testing.
|
148
|
149
Topside rebuild in process.
|
150
New plastic set installed.
The new ramps are being fitted with stainless flaps.
|
151
Most of the new ramps have been built and fitted with the stainless flaps.
|
152
|
153
Just another couple parts and the game will be finished.
|
154
|
155
|
156
|
157
|
158
|
159
|