41
Lower is guide coated and ready to sand.
|
42
Lower sanded and ready to refinish..
|
43
Lower refinished.
|
44
|
45
|
46
Head repairs complete.Head is sealed and primed.
|
47
Head is guide coated.
|
48
Sanded and refinished.
The correct warning text will be screened on after it sets a day or so.
|
49
|
50
Head is prepped and ready to screen.
|
51
Text screened.
|
52
Playfield is ready to prep fot the second round of touch up and clear.
|
53
Sanded.
|
54
Cleared.
|
55
Looks decent but I will sand it down and fine tune it one more time prior to the final clearing.STTNG is always a little to
|
56
Ready to prep for the final touch up and clear.
|
57
Sanded for final rework.
|
58
Final border rework.
|
59
Final clear applied.
|
60
|
61
|
62
|
63
While I wait for the playfield to cure I will get back to the rest of the game starting with the coils and mechs.
|
64
All coils and mechs have been torn down.They will be polished/and or plated then rebuilt with new hardware as needed.
|
65
Underside,mech and coil parts are back from the plater.Also plated were the power box,prop rod,lcok bar catch.
|
66
Coil parts not plated were tumbled or cleaned.
|
67
Coils mechs etc rebuilt.
|
68
|
69
|
70
Cannon housings were plated,new harneeses were used and the laser pointers wer installed.
|
71
The cannon motors will be rebuilt as well.
|
72
One cannon motor rebuilt.
|
73
The swtches are new and the wiring has been run through clear tubing to protect it from being crimped in the mech as it tur
|
74
I made an extenstion and plug set up for the newly added laser cannons to make them easy to R&I as well as have a more
|
75
The trough assembly will be replace with an updated version of the part itself as well as the boards.Most 6 ball games like
|
76
New assembly.
|
77
Cabinet is ready to decal.Some of the reassembly is already been done along with the ground braiding.
|
78
|
79
Decals applied.
|
80
Decals are finished and the head is back on the lower.
|