242
White sprayed lower.
|
243
White sprayed upper.
|
244
Upper needs some more work but is a better match for the lower now with fresh white.
|
245
Upper cleared for a second time.
|
246
|
247
Hopefully I can get this last insert sinking filled in and begin the final repaints on the next go around.
|
248
Lower ready to clear.
|
249
Lower cleared.
|
250
|
251
Shooter lane looks great.
|
252
|
253
|
255
|
256
|
257
after a couple days cure I should be able to get back to it.
|
258
While waiting on the playfields I will chip away at the rest of the parts.Swap out the plastics.
|
259
New ramp is built.
|
260
Power box and switch plate were nickel plated and rebuilt with a new long cord.
|
261
Upper playfield tracks are going to be refinished and the metal will be polished.
|
262
Example as rebuilt.
|
263
Coil parts are finished polishing and ready for rebuild.
|
264
Coil and flipper assemblies rebuilt.The flipper coils are new but I made a good effort to save all the original coils si
|
265
Ready to start dealing with the insert borders.
|
266
Refinished.
|
267
Ready to clear.
|
268
Cleared upper.
|
269
Lower insert issues are being addressed.
|
270
Lower inserts blacked in.
|
271
Ready to clear.
|
272
Cleared.Lower.
|
273
Cabinet wiring is complete.
|
274
T molding installed.
|
275
|
276
Powered up for testing.
|
277
Lower is sanded and ready to polish.
|
278
Lower polished.
|
279
|
280
|
281
|
282
Playfield is set in game for nw rebuild begins tomorrow.
|