283
New sockets and braid are installed.
|
284
Through parts are o n the topside.
|
285
|
286
Underside wiring is next.
|
287
Underside rebuild nearly complete.
|
288
Playfield is ready to put in the cabinet.
|
289
Lower playfield in the cabinet.
|
290
|
291
|
292
|
293
Powered up for testing.
|
294
Upper getting the final touches.
|
295
Final clear applied to upper.
|
296
Upper sanded and ready to polish.
|
297
Upper polished and t nutted.Ready for rebuild.
|
298
Upper reabuild begins.
|
299
Ball guides in place.
|
300
|
301
Ready to flip and wire.
|
302
|
303
|
304
Underside rebuilt.
|
305
Upper is in the cabinet.
|
306
Plastics are installed.
|
307
|
308
Just a couple minor details left and I will be done.Long road to get to this point.
|
309
Powered up for testing.
|
310
Finished the game up today less a couple very minor things like installing the apron cards and playfield glass.
I have
|
311
|
312
|
313
|
314
|
315
|
316
The NOS display glass is installed as well as the repro backglass..
|
317
|
318
Powered up to get a feel for the finished product.
|
319
|
320
|
321
|
322
|