80
Detailing the condition still.
|
81
Gopher #1 torndown.
|
82
|
83
After a couple hours I have managed to get a respectable shine on the bracket.
|
84
Just go a few of the parts back from plating as well.
|
85
This is what we started with.
|
86
This is where we are at now.I have one more assembly left to do munally.The others are plated and need to be rebuilt..
|
87
These are the others that were done manually.
|
88
Playfield had cured and is ready for the final sand and clear.
|
89
The light reflection shows the previously raised insert is almost perfectly level this final sand and clear will finish the
|
90
|
91
Playfield sanded again.
|
92
I am going to catch some of the other insert bordering issues.The white shows a crack in the art.
|
93
Cut throughs are addressed.
|
94
|
95
a little red work is done.
|
96
Repaired areas are unmasked and much improved.
|
97
Final clear applied.
|
98
Light reflections verifies the level of the lower inserts now.The clear is wet in the pics but will further level out as
|
99
|
100
|
101
Slam ramp area as repaired.
|
102
After a few days cure it will be ready for final sanding and polish.
|
103
Playfield has cured and it is now sanded and prepped for final polishing.
|
104
Playfield polished.
|
105
|
106
|
107
Highlighting the final level of the previously raised insert.Makes a nice smooth transition now no longer a speed bump.
|
108
Playfield is now ready for rebuild.
|
109
Cabinet refresh begins.
|
110
Head is removed.
|
111
Speaker and plate will be replaced.I will get it in there straight this time.
|
112
Plate is out.
|
113
Inside will be repainted just to freshen it up.
|
114
Inside masked ,covered and sprayed.
|
115
Rails are removed.
|
116
|
117
New chrome rails installed.
|
118
Head is being rebuilt.Metal panel was reconditioned.
|
119
Remote holder installed as requested.
|