121
Inside sanded as clean as possible.
|
122
Cabinet is stripped.
|
123
Repairs are in process.
|
124
Head is stripped.
|
125
Head repairs are in process.
|
126
Interior of this cabinet is very rough.
|
127
Repairs are complete on this side so I will guide coat and fully straighten the wood.
|
128
A large heavy flat sander is used.The cabinet is now perfectly straight on this side.
|
129
Interior is masked.
|
130
Repairs are complete and the cabinet is ready to prime.
|
131
Cabinet primed.
|
132
Cabinet guide coated.After a day or two I will sand and paint it.
|
133
Playfield is sanded and ready to polish.
|
134
Playfield is polished.
|
135
|
136
|
137
Playfield is ready for t nuts and rebuild.
|
138
Cabinet is sanded and cleaned.Ready to paint and clear.
|
139
Painted and cleared.Glossy now but will die down to a matte finish as it cures.
|
140
After a couple days cure cabinet will be ready to prep for decals and rebuild.
|
141
Cabinet is dry.
|
142
Cabinet unmasked.
|
143
Head is ready to screen with warning text.
|
144
Warning text is applied.
|
145
Mini playfield is prepped and ready to clear.This is a much nicer one that I have then the one that was originally withthe
|
146
Mini cleared.
|
147
Cabinet is prepped and ready to decal.
|
148
|
149
Decals applied.I will finish the edges out next and the game will go into rebuild.
|
150
Decal edges are finished.
|
151
Ready to rebuild.
|
152
New rails are installed.
|
153
Head is being rebuilt.Driver and dmd controller needed servicing a new battery holder and correct ROM were installed i
|
154
Head is back on lower.
|
155
|
156
Cabinet is wired and up on legs.
|
157
Playfield is ready to rebuild.
|
158
Through parts are being installed.
|
159
Ball guides are drilled for optos as I work to complete the 3rd magnet conversion.
|
160
Minor change at the ball guide leading to the rocket kicker in order to eliminate bounce outs and misfires.
|