43 Cabinet is ready for teardown.
44 Cabinet is gutted.
45
46 Donor cabinet is sanded.
47 Ready to paint.
48 Based in black.
49 Matte cleared.Still wet in the picture.
50 Cabinet has dried overnight. Unmasked.
51 Back of the head will now be screened with the proper warning text.
52 Head is screened.
53 While the cabinet cures a few more days(to fresh to decal) I will move back to the playfield.It is sanded and ready for the
54 Final polish is done.
55 Shooter lane turned out great.Much better look than it previously had.
56
57
58 Playfield is ready to t nut and rebuild.
59 Cabinet is ready to decal.
60 Decals applied.
61 I will finish the edges out next.
62 Edges are finished.
63
64
65 Cabinet is ready to rebuild.
66 Driver board was serviced.
67 Head is being rebuilt.
68 New rails are installed on lower.
69 Head is back on lower.
70
71 Cabinet is now ready to wire.
72 Cabinet is wired.
73 Shaker motor installed along with all other parts that are related to the cabinet.Many have been replated other have been po
74
75
76 Up on legs now.
77 Cabinet is done now it needs a playfield.
78 Playfield rebuild is in process.
79 Through parts are installed.
80
81
82 This is a close up of what you had for a ball guide(on the left) and what you should have on the right.