125
Final clear applied.
|
126
|
127
|
128
After a few days cure it will be ready to sand polish and begin rebuild.
|
129
Decals are applied.
|
130
|
131
Edges will be finished out next.
|
132
Edges are finished.
|
133
|
134
Corner alignments are great.With these decals you have to choose what is most important upper or lower.Since the lower wil
|
135
|
136
Other side alignment.
|
137
|
138
Ready for cabinet rebuild.
|
139
Playfield has cured and is now sanded and ready to polish.
|
140
Playfield is polished.
|
141
The underside will be sanded clean.
|
142
Underside sanded clean.Ready to t nut.
|
143
Underside t nutted.
|
144
Topside t nutted.
Ready to rebuild.
|
145
All parts that were not plated or polished by hand were tumble polished.
|
146
New oak rails were made and are installed.
|
147
Better shot of the new rails.
|
148
Through parts are being installed.The mode start hole fixture has been moved back a bit to help eliminate the bounce
|
149
New jet bumper parts.All ball guides were regrained and have the trails worked out of them.
|
150
Most of the through parts are now in place.
|
151
I will rebuild the coils now.
|
152
They are typical.Dirty,broken the usual.
|
153
|
154
|
155
Coils are torndown in sections.
|
156
Each part is cleaned then polished by hand.
|
157
The bracket on the left is cleaned and polished.The one on the right is just cleaned.Big difference in both the look and ti
|
158
Trough will be fully rebuilt as well.
|
159
New boards are going to be used as well as a sleeve that eliminates stuck balls.
|
160
Trough rebuilt.
|
161
Coils are done now.
|
162
Flippers rebuilt with just about all new parts including the correct coils.
|
163
|
164
All of the coils now finished.
|