161
Edges are finished.
|
162
|
163
|
164
|
165
|
166
|
167
Rebuild in process.
|
168
|
169
Head is rebuilt.
|
170
New rails are installed.
|
171
Nickel plated parts for the cabinet and underside.
|
172
Head is on the lower .
|
173
New coin door installed.
|
174
Correct labels are placed.
|
175
|
176
Head is wired.
|
177
Lower is neatly wired and rebuilt.
|
178
Plated parts and power box installed.
|
179
Cabinet is done.I will install the legs just before dropping the playfield in the cabinet.
|
180
Apron is masked and based in black.
|
181
Apron is cleared.
Will be ready to install in a day.Probably before i need it anyway.
|
182
Playfield is t nutted and ready to assemble.
|
183
Through parts are being placed.
|
184
New bumper parts,regrained metal etc.
|
185
New post.Correct hardware is now being used.
|
186
Topside is about as far as it goes for now.
|
187
Underside rebuild in process.
|
188
Rebuilt switch harness installed.
|
189
Lamp harness roughed in along with most boards.The lamp harness will need a little more work tighten up the previous issue
|
190
Plated parts are installed .
|
191
Underside wiring as far as it goes out of the game.
|
192
Playfield is in the cabinet.
|
193
Powered up for initial testing.
|
195
Castle,new plastics,ramps,plated wireforms are now installed.
|
196
|
197
|
198
Game is finished less just a little detailing underneath.
|
199
Rebuilt translite installed.
|
200
|
201
|