41
Hole is and insert prepped.
|
42
Reset and glued.Nice and level now.
|
43
A quick chemical wipe down and the ground in dirt is gone for the most part.The hazing of the inserts is not but as it rest
|
44
Ready to begin the prep process for repaints and clear.
|
45
Mylar sections have been removed and the playfield has been cleaned as much as possible.
|
46
Shooter lane will need some thorough sanding to get it back in shape.
|
47
Shooter lane sanded.
|
48
I hope to eliminate most if not all of the ghosting in the inserts and still have the semi clear look that is present from
|
49
The diamonds and blue circles show the worst.
|
50
The lower is not too bad ff insert wise.The lump present from the large decal in the center will show more with the first r
|
51
Prep for the inital clear is complete.I will not be reworking the colors and issues until I get a good seal and decent leve
|
52
Initial clear is applied.It doesn't look like much yet but it will take shape in the next applications after sanding.For now
|
53
Shooter lane looks better already.
|
54
Ghosting is eliminated/minimized.Hazing still present but as the ghosting goes away the hazing will be less of a factor.Hav
|
55
The reset volt rollover is still rough for now but it is sealed up and level so the repaint can take place.
|
56
Playfield is ready to prep for the repaints and next clear.
|
57
|
58
The volt roll over will be refinished.
|
59
The insert bordering will also be fixed and the JTC insert will be refinished as needed to eliminate the dark ring around
|
60
These volt roll overs will need attention as well and like the last picture this one helps give some idea of the improveme
|
61
Playfield is sanded.
|
62
Repaints begin.
|
63
The reset volt rollover is having the yellow portion roughed in.
|
64
Still need to do the red and detail work but that will have to be done after it is cleared again.For now this is just the
|
65
The worn upper volt rollover is refinished as needed.
|
66
This one should be fine from here on.
|
67
The JTC insert bordering is repainted.This is a very tough one because of the color and pattern.
|
68
JTC insert rework turned out great.The texture and edging will come together once cleared.
|
69
The next issues that need to be addressed are probably the toughest and that is the insert bordering in the lower inserts.T
|
70
The only way to eliminate the bordering properly is to repaint it.That means a lot of masking and cutting.That has been don
|
71
Blue unmasked.The white will be next.
|
72
White insert issues have been refinished as needed.
|
73
White areas unmasked.
I am going to leave it at that.Much improved.
|
74
Ready for the next clear.
|
75
Second clear applied.
|
76
Insert bordering in the lower is much improved.
|
77
Yellow on the volt rollover is in place.The red and detail work will be done on the next session.
|
78
Upper volt rollover reworks are complete.
|
79
This will set a couple days then the final rework and clear will be done.
|
80
Playfield is cured and ready for the final tweaks.
|