126
|
127
Head refinished.
|
128
Head being rescreened,
|
129
|
130
Lower refinished.
|
131
New chocks and glides installed.
|
132
Head is rebuilt and ready to decal.
|
133
Cabinet is decaled.
|
134
Edges will be finish next.
|
135
Edges are finished.New siderails are installed and the head is back on the lower.
|
136
|
137
Correct tags are installed.
|
138
|
139
Wiring the cabinet is next.
|
140
Cabinet rebuild is fairly complete at this point.Legs are installed.
|
141
I will tighten up the wiring a little more after everything is in place.
|
142
Yes IT IS in good company ;-)
|
143
Playfield has been sanded and polished.All parts have also been cleaned,tumbled polished etc.The through parts are in pl
|
144
|
145
|
146
Topside is as far as it goes without wiring.
|
147
The underside was sanded clean,polished T nuts installed etc etc. Underside rebuild begins.
|
148
The switch harness is roughed into place.
|
149
The yellow oblong targets on CV take a beaig so all for will be replaced.
|
150
The replacements are reinforced and should hold up well.
|
151
The flippers were rebuilt with all new parts.
|
152
Switch harness is in place most of the roll overs were replaced for reliability.
|
153
Lamp harness roughed in place.
|
154
All of the lamp boards around the Ring master and trough assembly have been fited with GE 444 bulbs which ar military grad
|
155
Soleniod harness is roughed in place.
|
156
All mechs were tumbled and are being rebuilt.
|
157
The Ring master is taken apart o be cleaned and rebuit.
|
158
Ring master rebuilt.
|
159
Playfield is wired and most parts are in place underneath.
|
160
Playfield is back in the cabinet.
|
161
Powered up for testing.
|
162
|
163
|
164
New plastic set will be swapped and installed.
|
165
Plastics are being put in place along with other associated parts.
|