1 Game came in already taken apart(in boxes).First I will do the ramps.
2 Made my own harness for both ramps so they will be neater. Right ramp is built.
3
4 Left ramp built.
5
6 New lamp sockets.
7 All wiring run through black shrink tube to further hide and protect it.
8 Donor playfield is being prepped for the first clear.
9 Initial repairs are made at the merlin hole.
10 Shooter lane is reworked as well as possible at this stage.It will be reworked more during the process.
11 First clear applied and wet in the following pictures.
12
13
14
15 After a couple days I will sand it and beginthe repainting process.
16 Donor cabinet is in process as well.
17
18 Repairs are complete.
19
20
21 Cabinet is sealed.
22
23 Head painted and cleared. will screen it after an overnight cure.
24 Lower painted and cleared.
25 Cabinet is being prepped for decals.
26
27 Head is being screened with the warning text.
28
29 Playfield is sanded and ready for repaints.
30 Shooter lane will need a little refinish work.
31 Switch cut outs will need to be reworked.
32 Merlin hole will need to be refinished.
33 Some repaints are needed at the super jets insert.
34 Wood tones are refinished as needed.
35 Colored areas that need attention are done.
36 Second clear is applied.
37
38
39
40