1
2
3
4
5 Head gutted.
6
7
8
9 Playfield stripped.
10
11
12
13
14 Playfield is being prepped for the first clear application.
15
16 Shooter lane reworked and sanded clean as possible.
17 Ready for the first clear.
18 First clear applied.
19
20
21
22
23
24 Head is off lower.Head will be completely redone.Lower will be refreshed.
25 Lower is now emptied of all parts and wiring.
26 Rails removed.Any minor paint loss as a result is unavoidable but will be covered once the new rails are placed.
27 Will do what I can to sand the floor clean although this game does use a very heavy and sloppy overspray pattern that has
28
29 Old chocks were removed as well.Next stop for the cabinet will be the paint shop.
30 Cabinet is in the paint shop and ready for rework.
31 There is typical wear around the legs.These direct to wood screened WPC-95 games are extremely fragile and have poor adhes
32 Same issues other side.
33 Floor will be sanded as clean as possible interior reworked and refinished erc.
34 Rough wood on the inside.
35
36 Poor finish from the factory but it isn't unusual or a real detraction we just expect better moving forward.
37
38 Will rework the seams and grain on the face.The head will be redone entirely as it has a few too many blemishes and impr
39
40 The back will be stripped refinished and rescreened.