41
Head is removed and will be replaced.SS uses a unique head because it is WPC-95 based but has the swing out lamp panel so t
|
42
Lower is in the paint shop and ready to be reworked as needed.The outside will remain mostly untouched less a couple struc
|
43
there is a light bit of overspray on the floor.That will be removed during the refresh and put back in but on a smaller
|
44
this joint will need to be repaired.
|
45
the inside looks to have been hard masked and possibly brush painted.I deally I would like to have the overspray come down a
|
46
This side is extremely rough.The grain is very ugly and deep.It requires a good deal of fill work to be brought up to par
|
47
Rear and top plate will be refreshed and new oak chocks will be installed.
|
48
Will sand the bottom as clean as possible but it is mdf and there are some gouges and stains that might not come out co
|
49
The need to realy sand the floor well becomes more obvious now as the moisture and swelling from various spills has crea
|
50
Working the inner sides now.
|
51
The broken joint is opened.
|
52
Glue is applied.
|
53
Brad nailed in a hidden area that will be under the rails to finish off the repair.
|
54
Other inside panel is being worked.
|
55
Masked and ready to refinish.
|
56
|
57
New chocks are painted at the same time.
|
58
Bolts are done as well.
|
59
Old head is in for reverence.
|
60
New head was painted a couple weeks ago when it came in.A little dusty from sitting but ready to prep for decals.
|
61
New had is screened with the correct warning text.
|
62
New decals are being applied.
|
63
Edges are finished but not yet painted.
|
64
|
65
Cabinet is back in rebuild now.A compromise that I can live with has been made so it does not look over the top and stil
|
66
New braid and plates are installed.
|
67
The corners are a little sharper now but not too much more can be done without turning it into a more extensive repaint
|
68
New chocks and labels are placed.
|
69
Outside is just about ready for tri and will rebuild quickly so I move now to the playfield.
|
70
Replacement playfield is t nutted.
|
71
Starting the rebuild.
|
72
Through parts are placed.
|
73
|
74
|
75
|
76
|
77
Building the underside now.
|
78
All coils and assemblies were cleaned,polished and rebuilt.
|
79
|
80
|