81
Skipping ahead most of the wiring and parts are now in place on the underside.
|
82
Supplied chrome rails installed.
|
83
|
84
New head is being built.
|
85
Head built and in place.
|
86
Black hinges are used to help tie the head and lower together more seamlessly than chrome would.
|
87
|
88
True chrome polished legs are being used.These are a little more expensive but are a bit better done on the inside than th
|
89
|
90
True chrome bolts will be used as well.
|
91
Metal parts were polished to remove corrosion.
|
92
Some were nickel plated when polishing alone was not enough.
|
93
Lockbar receiver was replaced because of the previous condition.
|
94
Cabinet is now built and wired.Neat and orderly of course.
|
95
Supplied laminated tech sheet is in place as well.
|
96
Goody bad will be reinstalled at a point prior to completion.
|
97
Playfield is now in the cabinet.
|
98
|
99
Apron was in nice shape so polishing was adequate.
|
100
|
101
|
102
Powered up for testing.
|
103
|
104
|
105
|
106
Will install the ramps and catch a few more details then the game is complete.
|
107
|
108
|
109
|
110
|
111
|
112
Game is complete a final link will be created.
|