121
|
122
|
123
Backboard is prepped and the rails were also stripped and will be refinished.
|
124
|
125
Refinished rails and backboard.Wet at the time of the picture.
|
126
Coindoor was in good shape overall so it was cleaned and refinished with the correct factory style finish.
|
127
New oak chocks are painted for the lower.
|
128
Lower is being prepped for decal application .
|
129
Decals are applied to the head.
|
130
Decals applied to lower.
|
131
|
132
Edges are being finished.
|
133
Inside unmasked.
|
134
|
135
Head edges finished.Ready to rebuild.
|
136
New chocks installed.Rear edges are done.They are easy because they are just black.
|
137
Front edges finished out.
|
138
Did my best to fill in the art so it has a nicer look than factory.
|
139
Cabinet is ready to build.
|
140
Underside and edges are as clean as possible.
|
141
Head is being built.
|
142
|
143
Serviced boards are being installed.
|
144
Head is on lower.All labels are placed.
|
145
Cabinet build is nearly complete.Will place the rails etc after the interior decals set overnight.
|
146
|
147
Neatly wired and detailed.Speaker and cabinet sheets are mounted nice and straight.
|
148
|
149
Plated and polished parts are used.
|
150
Interior was are slick and straight .
|
151
Backboard is ready for a new decal.
|
152
New decal applied.
|
153
Playfield is being built now.
|
154
Refinished rails are installed.
|
155
Wire guides are installed.Very carefully on an NOS playfield .
|
156
Installing the leg protectors.
|
157
They run a little long on the back which is fine if you are not setting it up and breaking it down but since this ga
|
158
Marked
|
159
Shortened.
|
160
High polished brass installed even the bolts.
|