41
Most of the coil assemblies are beat.
|
42
Translite will be the first thing I address.
|
43
There is the typical latch rub on it.
Also missing the top channel.
|
44
A few other stray scratched here or there.
|
45
|
46
Translite is cleaned, touched up,rebuilt with new channels.
|
47
|
48
|
49
Now for the lamp panel.
|
50
Not sure what happened here.
|
51
|
52
This will need to be completely torndown and refinished.
|
53
Torndown backside.
|
54
|
55
Repainted.
|
56
All metal polished.
|
57
|
58
Lamp panel is being rebuilt.New labels and clean wiring.The back was sanded clean also.
|
59
|
60
New labels on the front and polished metal.
|
61
|
62
|
63
Gutting the head.Will try to go with all original boards.
|
64
Underside teardown continues.So much extra wiring to work through but I have weeded out the original harnesses.
|
65
Will go through the wiring once harness at a time.
|
66
|
67
Getting some more parts off the topside now.
|
68
|
69
So dirty.
|
70
Will stop there for a bit and work some of the parts removed because of the extra attention needed.If not done in stag
|
71
Backboard mod is okay in general but needs to be reworked so it will be more durable and cleaner looking once inst
|
72
Hot glue is used both under the tap and on the edges and wiring to make this a much more bulletproof install that can
|
73
Wiring is also tightened up and wrapped for the strength of a single cable instead of a bunch of loose strands.
|
74
Many hours later all the ball guides are cleaned and regrained.
|
75
Working through the coils.
|
76
|
77
Coils are cleaned polished and rebuilt,replaced where needed.
|
78
|
79
Wrong coils on some assemblies like the lower flipper.
|
80
New flipper coils
|