1
Starting out with a previously gutted game.a new cabinet is built.
|
2
Much better construction.
|
3
New head is built.
|
4
Head is primed.
|
5
|
6
|
7
Lower was also primed and both the head and lower have been final sanded and prepped for base color and clearcoat.
|
8
Lower based in black.
|
9
Head based in the cream color both are cleared in full gloss for the time being.
|
10
New playfield is being prepped for clear application.
|
11
New playfield cleared.
|
12
|
13
|
14
|
15
Ready to strip the playfield and start working through all the wiring and assemblies.
|
16
Underside stripped.
|
17
All coils will be replaced.This project is more about building basically a brand new EBD or as close as humanly possibl
|
18
All new coils are being placed as the assemblies are cleaned polished and rebuilt.
|
19
New drop targets are being placed as these assemblies rebuild also.
|
20
Continuing to rebuild the drop target assemblies.
|
21
One big drop target assembly left now that this one is finished. .
|
22
This target bank is a beast.Now rebuilt.
|
23
Plastic set to be changed out.
|
24
|
25
New plastics are being built where needed.Mostly a process of removing and polishing the metal stand offs then heati
|
26
New plastic set in order.
|
27
Playfield is sanded and ready for one more light clear application.
|
28
Final clear applied.
|
29
Stenciling is being done.
|
30
|
31
|
32
Ready for the next clear application.
|
33
|
34
Second clear is applied.Still full gloss right now until the leveling is correct then we will go to the matte style clear.
|
35
|
36
|
37
Sanded and prepped for the final reworks .Mostly working the level at this point eliminating any hard lines.
|
38
|
39
|
40
|