41
Structural problem at the joint in the left rear leg location.You cab see howthe seam is not perfectly level.The
|
42
These cabinets are built with thin/weak floors.This leads to the next issue which is sagging of the floor from the
|
43
Various stains that likely will not clean nor sand out.
|
44
Lower gutted.Will remove the legs then a duplicate can be built to exact spec with some enhancements to overcome the
|
45
Playfield is sanded and prepped once more for a second and final clear application.
|
46
|
47
|
48
|
49
|
50
After this clear fully dries it will be sanded and polished.
|
51
Playfield is sanded and ready to polish.
|
52
Playfield is polished.
|
53
|
54
|
55
|
56
|
57
Playfield is ready to start assembling.
|
58
|
59
|
60
|
61
|
62
|
63
|
64
|
65
|
66
|
67
|
68
|
69
|
70
|
71
|
72
|
73
|
74
|
75
Cabinet is sanded and prepped for the painting process.
|
76
Head sanded and prepped.
|
77
|
78
First I want to go over the color choices.I am going with a yellow base that better matches the yellow used on t
|
79
The color mixed/ chosen is now compared to the original cabinet and you can se it is bit more yellow and has more p
|
80
Now the color is allowed to dry on the original to give a real comparision.As can be seen once dry it is not a huge
|