120a
|
121
|
122
Final clear on the lower.
|
123
|
124
|
125
|
126
|
127
|
128
|
129
After this cures overnight I will take some more pictures to highlight the final gloss level.
|
130
Now the final clear is fully dried and the sheen can be evaluated.
|
131
|
132
Te surface is refective but not overly glossy.It looks much nicer than factory but not too glossy which typically
|
133
|
134
|
135
|
136
Better angle on the side of the sheen.
|
137
|
138
I can now work on the cabinet hardware. The bolts are rusty.
|
139
Bolts are stripped and prepped.
|
140
Bolts are metal etched then refinished.This is also a more matted finish but it currently wet so it looks more glo
|
141
The metal playfield rails are also in need of stripping and refinishing.
|
142
The wear in this areas may require a slight fill in the small divots after the finish is stripped.
|
143
Playfield rails were stripped repaired and refinished.Still wet.
|
144
Will prep he legs and other trim for refinishing.The rails not pictured will be replaced as well as the lockbar.
|
145
Legs are sanded etched and texture coated,
|
146
Same process for the hinges.
|
147
Final finish applied to hinges.
|
148
Final finish on the legs.
|
149
Cabinet is ready to build.
|
150
Braid run is neatly mapped out.
|
151
New style plates are metal etched to better match the interior.These plates while not the "correct"version
|
152
Rear right plate modified to clear the cord cover housing.
|
153
Various internal parts are nickel plated.
|
154
|
155
Braid is run parts are being placed.
|
156
Protectors are installed at the leg locations.
|
157
|
158
|
159
New buttons extra ball is color matched to the start button.
|