81
Lower based in black.
|
82
|
83
|
84
Head is refinished.
|
85
Cabinet bolts are prepped and refinished.
|
86
Head has ben screened on the back with the warning text(not shown) and it is in the assembly area fro decal applicat
|
87
Lower prepped ready to decal.
|
88
Playfield is sanded and ready to polish.
|
89
Playfield is polished and ready to t nut.
|
90
T nuts installed.
|
91
|
92
Playfield now finished and fully prepped for build up.
|
93
|
94
|
95
|
96
Everything now in place I can begin the rebuild process.
|
97
Lower decals are applied.I will finish the edges next.
|
98
Head decals applied.
|
99
Freshly serviced driver board will be installed.
|
100
Edges are finished and the cabinet is being built back up.
|
101
Polished chrome trim installed.
|
102
|
103
The rest of the chrome is done and installed.This would be a new door.
|
104
Chrome head hinges now placed instead of the black in the previous pictures.
|
105
|
106
Cabinet is being wired.
|
107
Cabinet is neatly wired.
|
108
|
109
|
110
Playfield is being built.
|
111
|
112
|
113
|
114
|
115
|
116
Full LEDs are used.
|
117
Playfield rebuild is about as far as it goes outside of the cabinet.
|
118
|
119
|
120
Playfield is placed in the cabinet.
|