42
43 Just about done with teardown.
44 Head is removed and will be replaced.
45 Lower fully gutted and also will be replaced.
46 Replacement playfield has been sourced.I had to return 3 of these to various vendors before I could actually get one I
47
48 This is the minor flaw that must be corrected.It is a small bug caught in the clear coat.It is in a obvious spot of th
49 Another angle of it.
50 Playfield is ready to prep and clear.
51 First step is to dig the bug out.Not too hard but it is a strange thing to deal with.A first for me on one of these and t
52 Playfield is sanded.
54 Area that had the bug is reworked as needed to remove all traces of it.
55
56 That is all that was needed now ready to clear.
57 Playfield is cleared.
58
59
60
61 Several weeks later and the playfield is sanded and ready for final polishing.
62 Playfield is polished.
63
64
65
66
67 Playfield is all set now and can be built up once the other parts are in good order.
68 Apron will be taken apart,cleaned and evaluated.
69 Apron is scuffed with some minor damage so it will be refinished as needed then clear coated.
70 The main ship will need to be replaced for a variety of reasons.The first is the bad and incorrect paint job.,The se
71 The final reason is that it is melted.
72 New ship.
73 New windows.
74 Windows are glued in place.
75 Main ship complete
76 The correct shuttle and decals for that shuttle are sourced.
77 Correct shuttle is ready to be used in the game now.
78 A new plastic set was sourced.Many of the ones that were on the game were nothing more than cheaply made paper cop
79
80 Copy topside.
81 Copy underside.This would not allow light through.
82 Real plastic topside.