122
Upper.
|
123
Playfield as cleared overall.Less thick and lumpy than as delivered.
|
124
The apron is pretty nice overall but needs to be freshened up.
|
125
All black repainted.
|
126
Cleared with a matte clear.It is fresh in this picture but like the cabinet it will die down once cured.There is a tiny ha
|
127
The old cabinet is ready to be gutted.Lots of rusty parts that will need much attention or plating.
|
128
the new lower is ready to prep for rebuild.That will involve drilling the holes for the playfield pivots in the side.
|
129
Much attention to detail was placed on the floor and chocking.
|
130
|
131
Starting on the cabinet parts one at a time as was done on the playfield.
First up is the transformer panel.
Very rus
|
132
Here are some of the other rusty parts that were removed.Some have already been de-rusted and will go out for plating.
|
133
The transformer plate is not something I want to chrome so i will recondition it through a series of bead blasting,sandi
|
134
the transformer plate reconditioning is complete.It took about 3 hours but was worth the effort since the panel is very pr
|
135
The power module board has been repaired and is now ready to install.
|
136
Transformer panel is rebuilt with all associated parts cleaned,service,polish and or replaced.
|
137
I will finish gutting and restore the cabinet parts one at a time starting with the head.
|
137a
|
138
Backbox lamp panel is removed and torn down.
|
139
Lamp panel refinished.All lamps will be replaced of course.
After is dries overnight I will reassemble the entire panel
|
140
The display brackets are lightly coated in rust.They will be bead blasted since little is seen and a polished finish is n
|
141
Display brackets are ready.New Pinscore displays will be installed.
|
142
Displays are ready to install.
|
143
Head is pretty much empty of all parts that will not be replaced.
|
144
Board mounts are cleaned.
|
145
Lower is being gutted now.The tilt assembly will be broken down.
|
146
Tilt assembly stripped.I don't care for the knotty wood on this side so I will flip it and drill it to be used with the ot
|
147
New side has been sanded I will drill it for reassembly later.
|
148
Lower is basically empty of all parts needed less the ground straps and coin door although that will be replaced in part
|
149
All cabinet wiring is removed for cleaning.The power cord was cut off and will be replaced with a new one to insure a goo
|
150
Cabinet wiring is thoroughly cleaned and dried.
|
151
The apron clear has dried overnight and is at it's proper gloss level now.
|
152
Cabinet and head are empty of all the needed parts.
|
153
All brackets etc not small enough to tumble were buffed.
|
154
Coin door is a wreck.Free play switch is an ugly install.
|
155
All the internal wire and hardware is missing.Luckily the volume pot and bracket are still present.
|
156
I will combine all this and a bit of work to make one nice door.The skin laying down is new.The old door is to the left
|
157
The donor door has all the wiring etc needed and I can add the volume pot to that.
|
158
Everything broken down.These parts will need to be bead blasted to remove the rust.
|
159
Bead blasted.Read for rebuild.
|
160
everything is just about in place less one or two parts.
|