40
|
41
Let it set for a week and I should be ready to do the final rework on it.
|
42
Playfield is sanded and ready for he next round of repaints.
|
43
Playfield cleaned and ready to repaint where needed.
|
44
Shooter lane is temporarily back down to natural wood so the definition is not lost during the next wood tone repaints.
|
45
During the leveling process the previous repairs to the boom balloon area are mostly lost.Not huge deal since looking
|
46
The volt repair will be dialed in a bit more now as well since it has also leveled out .
|
47
Ringmaster border will be reworked.
|
48
Wood tones pt 2.
|
49
Yellow rework pt2.
|
50
A few of the inserts need to be rebordered.All will not be required mostly because the borders on most inserts are so thi
|
51
Black work addressed.
|
52
Tweaks to the red.
|
53
Shooter lane though repainted remains somewhat natural looking.
|
54
Boom Balloon area reworked once again.
|
55
Ringmaster area .
|
56
Next clear applied.
|
57
|
58
|
59
It will most likely take one more sand and clear to get this thing in order.The lettering and leveling problems make it a
|
60
Sanded and ready for the final corrections and clear.
|
61
Repair is now level and in good order.Will need just a little finesse on the border.
|
62
Same thing on the RM area.
|
63
Corrections made and ready for the final clear.
|
64
Final clear applied.
|
65
Inserts while still not perfect are looking good.
|
66
|
67
Boom Balloon area now nearly in it;s final form.
|
68
Volt roll overs.
|
69
RM cut out.
|
70
|
71
Mini is cleared.
|
72
After a few days cure it will be ready for final sand and polish.
|
73
Playfield is sanded and ready for final polishing.
|
74
Final polish is done.
|
75
Shooter lane looks respectable.Short lanes can be tough but it should look great once rebuilt.
|
76
Inserts are much improved.Not quite perfect without the ability to strip them all but a fair trade to avoid the time a
|
77
|
78
Boom Balloon area turned out nice.
|
79
|