1
MM playfield as it arrived.Still somewhat populated with wireguides and bumper bodies.T nuts also.
|
2
|
3
There is some teardown damage to deal with.Chunk taken out at the post locations behind the left troll target.
|
4
Shooter lane is chipping and has ground in dirt.
|
5
I have stripped the parts off the playfield and can now fully clean and evaluate the playfield.
|
6
|
7
On the lower sections there is the typical splintering at the switch cut outs from the numerous ball drops out of the wir
|
8
Insert wear at the lower portion of the King Of Payne.
|
9
More teardown damage at the post hole and wire guide junction.Also of note there is isert bordering present on almost every
|
10
More insert bordering at the merlin target inserts.
|
11
Insert bordering in this area.
|
12
Insert bordering in the yellow starburst like insert art.
|
13
More insert bordering.
|
14
Insert bordering here as well as wear at the lower portion of the Jackpot insert.
|
15
Insert bordering is really noticeable in the yellow areas although it is present in many more.
|
16
|
17
Merlin hole will need some work as well as the insert just below.
|
18
More on the insert bordering documentation.
|
19
Normal wear at the moat kick out .Not a big deal.
|
20
Castle lock hole is pretty rough in the rear.It has worn well into the bottom side and the front routed section will nee
|
21
Ball swirl/ground in dirt at the jet bumper locations.
|
22
Graind in dirt/ball swirl at the loop in the upper right.
|
23
Now I am working on it.Starting with the shooter lane.A preliminary sanding to see what comes out and what does not.
|
24
Repairs are being made to the structural problems.This would be filling .
|
25
|
26
|
27
Repairs to the structure are complete.
|
28
|
29
|
30
|
31
The swirl will not sand out of the areas noted so repainting will be required.
|
32
Here I have just roughed in the moat wear prior to the first clear application.
|
33
|
34
|
35
|
36
Shooter lane will need more work but for now it is in a good spot to start working off of.
|
37
|
38
I will clear it next to seal everything up and give a foundation to paint off of later in the process.
|
39
First clear applied.
|
40
Shooter lane looks better but needs more work.
|