1
Typical unshopped CC at a glance.
|
2
|
3
A closer look reveals some issues that are not the norm.Mostly ghosted inserts and broken parts.
|
4
|
5
|
6
|
7
|
8
Teardown begins.
|
9
Pretty dirty.
|
10
|
11
Head is gutted.
|
12
Underside is VERY dirty and has some wring issues.Nothing that will be hard to fix well but worth noting.
|
13
Push on terminal have been eliminated.Some of the wiring is taped.
|
14
Underside teardown in process.
|
15
Wiring harnesses are removed.They are filthy.
|
16
Much effort will be made to make them look like new again.
|
17
The lamps harness is shown as an example.It is thoroughly cleaned.
|
18
Each socket was scrubbed notice the white is now obvious in the assembly.
|
19
The mechs and boards will be next.
|
20
|
21
|
22
|
23
|
24
Most of the underside is removed.The rest needs to be done after the top is stripped down.
|
25
Topside teardown in process.
|
26
|
27
|
28
|
29
The jet bumpers are blown out.
|
30
Playfield teardown is alomost complete.
|
31
Ghosting inserts,wear etc etc.
|
32
Mine hole is rough under the protector.
|
33
Playfield is out of the cabinet.
|
34
Playfield stripped complete underside.
|
35
Playfield stripped complete topside.
|
36
Playfield cleaned.
|
37
Shooter lane needs work.
|
38
Ball drop,switch cut out and wire guide locations will need work.
|
39
Ball drop/switch cut out issues.
|
40
Wear and ghosting.
|