201
Cabinet is at the shop for rebuild.
|
202
|
203
Better shot of the gloss level.
|
204
Cabinet rebuild starting with modifying the new rails to fit BR.
|
205
These are the corrections to be made.Shortening and making a hole for the head bolt.
|
206
Modifications roughed in.
|
207
Rails are ready.
|
208
cabinet is braided.New correct System 11 style legs are installed as well as the right flipper buttons and the rails.
|
209
|
210
|
211
|
212
Coin door is the correct one but will need to be restored.
|
213
Coin door torn down and cleaned.
|
214
Refinished and rebuilt with the correct patter and new slot parts.
|
215
Coin door installed.Lower is complete until the head is installed then it will be wired and finished out.
|
216
Boards were serviced.
|
217
Display panle is being rebuilt with new speakers etc.d
|
218
Head rebuild complete.
|
219
Head back on the lower.It is all downhill from here.
|
220
|
221
|
222
|
223
|
224
Lower playfield teardown .
|
225
|
226
|
227
Stripped.
|
228
Ready to clean and begin repairs.
|
229
Coils are ready to teardown for tumble and rebuild.
|
230
|
231
Lower ready for rework.
|
232
Shooter lane is solid should sand up nicely.
|
234
Graining will be a little challenging.
|
235
Comparing the DP lower to the non dp upper is night and day.
|
236
The biggest difference besides wear is the white .One is bright the other is almost brown.
|
237
Upper sanded.
|
238
Lower prepped.
|
239
Worn areas in the white of the lower are being addressed even before the first clear.
|
240
|
241
|