121
Magnet housing was plated.A magnet is installed but will not be wired in nor functional because the original magnet was no
|
122
Top third is complete.Very time consuming.
|
123
|
124
All lighting and braid is run and soldered.Probably another solid day or two of wiring and coil rebuilds until the playfi
|
125
Drop target banks are being rebuilt.I had some of the parts plated to freshen them up and give a nicer look to the undersi
|
126
Target bank rebuilt.
|
127
All banks have now been rebuilt and installed.
|
128
Sling shots will be rebuilt/polished next.
|
129
One sling shot done and pictured as an example.
|
130
Slings are now installed.
|
131
Flippers are rebuilt/polished.They were upgraded to the older style plungers and links.This is preferred on these gam
|
132
Both flippers rebuilt/upgraded and installed.I used color correct wiring to give a nicer look.
|
133
Ball launch assembly will be rebuilt next.
|
134
Saome parts of it were plated.Rebuilt and ready to install.
|
135
All coils are now rebuilt and installed.
|
136
A little more work right at the end of the playfield and it will be ready to drop in the cabinet.
|
137
|
138
|
139
The trough switches will be rewired.I have made a proper looking switch for the one that was mismatched and hacked in.I
|
140
Trough is neatly rewired with correct color wires and protective sleeving.
|
141
Playfield wiring is complete.
|
142
Playfield is in the cabinet.
|
143
Playfield is powered up for initial testing.
|
144
New post,rubbers,plastics etc are being installed.Most everything is on there just have a little more work to do on the
|
145
Powered up again.Considering going with the red translucent bats instead of the black.I think it might give a better contr
|
146
All plastics are now in place.
|
147
|
148
Black and white seems to be the best combination for the flippers.
|
149
Only the apron is left which is currently being refinished.
|
150
|
151
Apron will need repairs and repainting.It looks okay at a glance but there are several small nicks and dents.
|
152
The dents and hammered metal are straightened and filed out.
|
153
The drain area was very rough.
|
154
Repairs are sanded.
|
155
|
156
Apron is primed and based in black.
|
157
Gloss clear is applied.This is just used to seal and fill.After it cures a couple days I will sand and final paint it
|
158
Apron has been sanded.The shooter gauge is now painted the correct shade of maroon and cleared with a matte finish.Glossy
|
159
Apron is based again in black and final cleared with the matte finish.
|
160
Apron has dried to the correct gloss overnight.I will let it set another couple of days in order let the solvents finish
|