83
Most of the inserts show wear all will likely need to have the black borders repainted.
|
84
Some others will need some color work done since the wear is outside of the black borders.
|
85
Sanded.
|
86
Shooter lane reworked .
|
87
Prepped and ready for some initial repairs.
|
88
Holes filled.
|
89
|
90
Skill shot hole repaired.
|
91
Ready to clear for the first time.
|
92
Cleared.
|
93
|
94
|
95
The holes that were filled were roughed in I will rework them ino their final form during the true refinishing process.
|
96
|
97
After a couple days cure I will sand it then rework the insert borders and other art issues.
|
98
Going to teardown the mini next.
|
99
Mini stripped.There is some yellowing in the white,poor coverage in the red and the wood is just a bit rough overall but I
|
100
Mini cleared for the first time.Wet in the pics.
|
101
Starting with a new lower cabinet.Even though it is new it will need a good deal of work to be brought up to the HEP leve
|
102
New lower is guide coated.
|
103
The guide coat is used to show the highs,lows,ripples and grain in the wood.As I strategicly sand it will level out an
|
104
This shows ow much rippling and grain there is to eliminate.
|
105
Cabinet side is now straight and smooth.I will do this on all sides as well as the front and back.It can be very time co
|
106
Once that is complete I will mask and prime the cabinet.
|
107
Head is stripped and repairs are being made.
|
108
The seams,gaps and nail holes will be eliminated.
|
109
Repairs to the head are complete.
|
110
New lower is masked .
|
111
Lower is ready to prime.
|
112
Head is ready to prime.
|
113
Head primed.
|
114
|
115
Lower primed.
|
116
Lower guide coated.
|
117
Head guide coated.After an overnight cure it will be ready to sand and paint.
|
118
Playfield is sanded again..
|
119
Playfield cleaned and ready to begin repaints.
|
120
I will focus on painting the woodtones first.The hammered switch cut out.
|
121
The rocket cut out.
|
122
Wood tomes repaired as needed.
|