163
Final clear applied.
|
164
|
165
|
166
|
167
|
168
Door panel inserts are completely level and after a few days cure the playfield will be ready to sand and polish then
|
169
Cabinet is prepped for decals.
|
170
Braid is run.
|
171
Cabinet was built true to the original proto with attention to the power box plate.
|
172
Decals are being applied.
|
173
|
174
|
175
Head is decaled and being rebuilt.
|
176
Lower is finished and has new rails installed.
|
177
Head is mounted on lower.
|
178
|
179
I refinished the door panel behind Rod to match the correct proto look.
|
180
|
181
Cabinet will be wired and boards will be installed next.
|
182
Driver,sound and dmd controller all required service.
|
183
All boards are now installed in the head.
|
184
The lamp panel will be rebuilt and the 545 sockets will be changed out to utilize 455 bulbs.Same function as the 545 b
|
185
|
186
|
187
Conversion is complete.
|
188
Lamp panel rebuilt and installed.
|
189
Cabinet wiring is now complete.
|
190
All wiring is neatly routed.All parts are polished,replaced or plated as needed.
|
191
|
192
|
193
Tags were duplicated exactly in terms of serial number,voltage and production date.
|
194
Correct style reimport door is installed.
|
195
Cabinet is rebuilt and ready for the playfield.
|
196
Playfield is ready for final sand and polishing.First I will sand the underside clean.
|
197
Underside sanded clean.
|
198
Playfield is sanded and ready to polish.
|
199
Playfield is polished and t nutted top side.
|
200
Underside t nutted.
|
201
All new t nuts and hardware were used.
|
202
Playfield close ups now polished.
|