1 Head to be gutted.
2
3 Rough at the lock.Someone butchered the wrong one in it or tried prying it out at some point or something like that.
4 Damage extends inside as well.
5
6
7
8 Head gutted.
9 Head stripped.
10 This will be a tricky repair because of the location and the need for everything to fit and function just right.I think the
11 Dowel is glued in place.
12 Area inside is factory routed for the plate so that dowel is drilled down flush now.
13 Area is filled on the outside.
14 Filled on the inside.Will focus on other parts of the cabinet prep while this sets up.
15 Two fingers just mean this is the second HG cab I have in process so I can keep track of them.
16 I will drill the front for the coin door fame then mask it for primer.
17 Drilled and masked.I used some blue tape for bordering so I can now keep track of the cabinets easier.
18 Lock hole repair is complete.
19 Interior is not quite as pretty because of the tight quarters to work in and other requirements needed to make sure it fu
20 Ready to prime.
21 Primed.
22
23 Hole repair looks good .Will let this set then sand and paint.
24 Sanded and based in white.
25
26
27 First stencil is set and corrections were made where needed for proper sizing and alignment.
28
29 Blue is done.
30 Red is done.Ready to clear for the first time.
31 First clear applied to the head.
32 First clear applied to the lower.
33
34
35 Will let this set a day or so then sand,make minor stencil corrections where needed and then do the final matte style cle
36 Sanded and ready for the matte clear.
37
38 Matte clear is applied.
39 Matte clear wet.Will dry to the correct gloss overnight.
40